Installing in Conduit
For new conduit installations, install a 70mm conduit using the same methodology laid out above for direct burial or installation within a sand filled trench.
Ensure the ends of the conduit are cut to allow the ASP reference sensor to protrude from the conduit and be securely fixed to the reference pad.
-
Prepare Decoiler
-
Assemble the ASP decoiler and place at the end of the conduit
-
Place the ASP onto the decoiler and cut binding zip-ties
-
Temporarily fasten the cable and cable end of the ASP to the decoiler frame
-
-
Attach Pulling Sock
-
The ASP is supplied with a pulling sock – a stainless-steel mesh
-
Push the pulling sock over the end of the ASP all the way
-
Tug to engage
-
-
Prepare Pull Cord
-
Feed a strong paracord (min break rating 50kg) through the conduit using a fish tape or compressor
-
Attach the cord to the ASP pulling sock using a bowline knot
-
-
Pull Through Conduit
-
With one person feeding the ASP into the conduit and another gently pulling
-
Slowly feed the ASP into the conduit until in position
-
-
Secure and Connect
-
Coil excess length on top of the reference pad and bundle with cable ties
-
Fix the reference sensor to the reference pad using the ASP fixing bracket
-
Run the cable through a flexible conduit to the data logger location
-
-
Function Test
- Conduct a function check to ensure no damage has occurred during installation
-
Final Steps
-
Bury the reference pad and sensor, ensuring the settlement point is easily accessible
-
Allow the system to stabilise for 24-48 hours before taking a base reading
-
Always conduct function tests before and after backfilling to identify and address any damage during the installation process.
Always conduct function tests before and after backfilling to identify and address any damage during the installation process.